Contact Us

Civil Construction & Infrastructure Surveys

Survey support for roads, drainage, earthworks, subdivisions and public assets across Victoria. Control that holds from the first stage to the last, on projects that run for months.

Book A Meeting
WHY IT MATTERS

Long Jobs Punish Small Inconsistencies

Civil projects run long, stage in sequence and involve several contractors. That combination is unforgiving of survey work that is only mostly consistent.

  • Control That Drifts

    A control network that was adequate at the start becomes the source of every argument by stage four.

  • Extended Site Boundaries

    Long alignments mean control has to be carried a long way, and error accumulates over distance if it is not managed.

  • Traffic and Access Constraints

    Live road corridors limit when and where survey can happen, which shapes the method as much as the accuracy does.

  • Variable Ground Conditions

    Ground that behaves differently along the alignment affects earthworks quantities, and quantities drive claims.

WHAT WE COVER

Survey Across the Civil Project

From establishing the control at the start to the as-constructed submission at the end.

  • Roads, Kerb and Pavement

    Set out and verification for road construction, kerb and channel, pavement layers and subgrade.

  • Drainage and Sewer

    Set out and as-constructed survey for drainage and sewer, including the utility investigation that precedes it.

  • Subdivision and Earthworks

    Subdivision set out, bulk earthworks support, machine control models and volume tracking through construction.

  • As-Constructed and Handover

    A-SPEC surveys and as-constructed documentation prepared to the council's specification for first-time approval.

Discuss Your Project
WHY OUTRIGHT

Site People, Not Just Surveyors

The difference on a civil job is usually judgement rather than equipment.

  • We Have Built This Work

    Our surveyors have worked construction, so a model, a mark or a report comes out in a form the crew can actually use.

  • Problems Flagged Early

    We raise the discrepancy when we find it, not in a report a fortnight later when the concrete has cured.

  • One Provider, Whole Project

    Utilities, machine control, monitoring, tender volumes and as-constructed all from the same team and the same control.

Civil Construction Surveying Across Victoria

Roads, Drainage and Pavement

Civil surveying focuses on large-scale assets: roads, drainage, earthworks, subdivisions and the public infrastructure that goes with them.

Accurate control networks and careful level transfer maintain continuity across construction stages, which is what keeps a long alignment agreeing with itself from one end to the other.

Subdivision Civil Works

On residential subdivisions the civil works and the cadastral work run in parallel, and they need to agree. Roads, drainage and services get built against the engineering design while the plan of subdivision proceeds through certification.

Because we do both, the civil set out and the subdivision plan reference the same control rather than two independently established networks.

Learn more about land subdivision

Working in Live Corridors

Road projects rarely get the site to themselves. Traffic management, staged occupancy and night works all constrain when survey can happen and how.

Where it suits, drone capture removes some of that constraint entirely. Certain road corridors can be flown without a closure, which takes the traffic control cost out of the survey.

Learn more about drone surveying

Earthworks, Machine Control and Volumes

Bulk earthworks on a civil job means machine control models, progress tracking and volume reporting, all of which have to agree with each other.

We build the models for the machines, track production against them and report the volumes, so the surface the excavator is working to and the surface the claim is measured against are the same surface.

Learn more about machine control

As-Constructed and Council Handover

Civil projects that hand assets to a council need A-SPEC as-constructed data, and incomplete submissions come back.

We capture the asset information as the work proceeds rather than reconstructing it at the end, which is the difference between a submission that gets approved and one that generates a fortnight of rework.

Learn more about A-SPEC surveys
FAQs

Civil Surveying Questions

  • For ongoing site support most civil projects run on a day or half-day rate, and on longer jobs a retained arrangement or a dedicated survey manager usually works out cheaper than calling crews in as needed. Discrete pieces like a set of levels or an as-constructed survey get a fixed price. Tell us the project and duration and we will scope it.

  • Yes, it happens regularly. We start by reviewing the existing control and design models, because inheriting control without checking it compounds whatever error is already there. From there we can run daily site survey or take on the whole survey function.

  • Yes. We are qualified A-SPEC surveyors and councils regularly recommend us. We capture the asset data as construction proceeds rather than reconstructing it at handover, which is what gets the submission approved first time.

  • Yes, across Trimble Earthworks and GCS900, Leica iCON, Topcon and UTS grader systems. We build them for the operator rather than converting the design file straight across.

  • Yes. We prepare pothole investigation plans, coordinate the investigations on site and survey the exposed services, working to Australian Standards quality levels and inside your permit and safety framework.

  • Yes. We work across metro Melbourne, South West Victoria and Gippsland, and regional infrastructure makes up a large share of our civil work. We mobilise efficiently for regional jobs rather than pricing the travel as a penalty.

Testimonials

Trusted By Businesses Across Australia

  • Luke Vearing Construction Manager at Speedpro Civil

    Speedpro has had the pleasure of working alongside Outright Surveying for over 10 years, and we are always thoroughly impressed with their level of expertise, professionalism, accuracy, and reliability.

  • Rowan Bird Project Survey Manager at Seymour Whyte

    I’ve been working with Outright Surveying on several projects. The team consistently deliver with reliable and easy to deal with Surveyors, making the projects run smoothly.

  • Nevil Sabu Alex Construction Manager at John Holland

    Outright Surveying has been my trusty surveying partner for close to a decade. The service I have received from their surveyors and management team has been second to none.

Contact Us

Start Your Project With Confidence

Infrastructure surveys, building setouts, 3D scanning, aerial mapping and more. Our experienced team is ready to help. Tell us about your requirements and we'll respond as soon as possible.

Send us a Message