Project Overview
Outright Surveying provided construction surveying and spatial support for the Terang Battery Energy Storage System (BESS), working alongside TEC-C and Symal.
Our team supported key stages of construction, providing survey setout, machine control data and verification across civil, structural and electrical works within the battery storage facility.
Site Challenges
The project involved delivering a large amount of civil, structural and electrical infrastructure within a relatively condensed site footprint.
With numerous structures, underground services and electrical assets located in close proximity, accurate setout and coordination between disciplines was critical to maintaining tolerances and avoiding clashes during construction.
The density of infrastructure also required careful management of survey control and construction information as works progressed across multiple areas of the site.
Our Approach
Outright provided coordinated survey support across the civil, structural and electrical components of the project.
Machine control models and construction data were prepared for bulk earthworks and road construction, while detailed field setout supported the installation of structures, slabs and associated infrastructure.
A significant component of the works involved detailed electrical setout, requiring accurate positioning of infrastructure within a highly congested site environment.
Progressive verification and as-constructed surveying were undertaken throughout construction to provide reliable spatial records and assist with quality assurance and project handover.
Results Delivered
- Machine control files and models for bulk earthworks and road construction
- Structural and concrete slab setout
- Detailed electrical infrastructure setout
- Civil and services setout
- Establishment and maintenance of survey control
- Level, alignment and positional verification
- Progressive as-constructed surveys
- Final site as-constructed documentation
Through accurate setout, coordinated survey management and progressive verification, Outright supported the efficient delivery of complex civil, structural and electrical works within the constrained BESS site.