Renewable Energy Surveying in Warrnambool
Get turbines, roads, cabling and battery infrastructure built where the design says, with survey support from the first site visit to final handover.
Get A Free QuoteSurvey That Keeps Energy Projects on Position and Program
Energy sites bring huge footprints, tight tolerances on turbine and electrical positions and works that run for years. A control error early on leads to costly repositioning and compliance issues later.
Outright Surveying has delivered survey since 2009, including four years on the 96.6MW Hawkesdale Wind Farm and civil, structural and electrical setout on the Terang BESS. With more than 30 surveyors and four disciplines in one firm, developers, EPC contractors and project managers get one team from the first layout to as-built handover.
"Outright Surveying has been my trusty surveying partner for close to a decade. The service I have received from their surveyors and management team has been second to none." Neville Sabu Alex Construction Manager - John Holland
Energy Project Surveying From Start to Handover
Renewable Energy Surveying
Full-cycle survey for wind, solar and battery projects under one team.
Design Volumes
Cut and fill quantities for turbine pads, hardstands and roads before the first machine moves.
Machine Control
Verified models for bulk earthworks and access roads across the whole site.
Foundation and Electrical Setout
Turbine foundations, crane pads, trenches, slabs and electrical assets set out to tolerance.
Why Warrnambool Energy Projects Choose Outright
Our renewable energy work in the South West is not theoretical. We have carried wind and battery projects in this region from early survey through to final records.
Hawkesdale Wind Farm
23 turbines, 19 km of roads and a four-year program for BMD.
Terang BESS
Civil, structural and electrical setout on a congested battery site.
One control network
High-accuracy GNSS control set up at the start and held to the end.
Ground and air
Field survey and drone capture combined to cover large sites.
Direct line to Troy
Troy leads our South West team and works on the projects himself.
Depth when needed
30+ surveyors and 15+ years in business to keep pace with your program.
Trusted By Businesses Across Australia
- Luke Vearing Construction Manager at Speedpro Civil
Speedpro has had the pleasure of working alongside Outright Surveying for over 10 years, and we are always thoroughly impressed with their level of expertise, professionalism, accuracy, and reliability.
- Rowan Bird Project Survey Manager at Seymour Whyte
I’ve been working with Outright Surveying on several projects. The team consistently deliver with reliable and easy to deal with Surveyors, making the projects run smoothly.
- Nevil Sabu Alex Construction Manager at John Holland
Outright Surveying has been my trusty surveying partner for close to a decade. The service I have received from their surveyors and management team has been second to none.
Get A Free Quote in Warrnambool
Get turbines, roads, cabling and battery infrastructure built where the design says, with a team proven on Hawkesdale and Terang. Tell us about the project and we will give you a clear quote.
- Phone 0413 147 976
- Location South West Regional Victoria
South West Victoria
- Phone 0400 751 199
- Address 4/20 Duerdin St, Clayton
Melbourne
Renewable Energy Surveying in Warrnambool: Common Questions
Energy projects vary widely in size, so we scope each one. Early work such as a feature survey or design volumes is usually a fixed fee, while construction setout and survey management are priced on the program, often as a retained arrangement across the build. Send us the site layout and program and we will put a proposal together.
We supported BMD Constructions on the 96.6MW Hawkesdale Wind Farm from 2020 to 2024, and worked with TEC-C and Symal on the Terang BESS, providing civil, structural and electrical setout.
As early as possible. A feature survey and control network at the start give designers accurate ground data and give every later stage a single reference. Changing control partway through a project is where errors creep in.
Yes. On the Terang BESS, detailed electrical setout was a significant part of our scope, alongside slabs, structures, earthworks and roads, all within a tight site footprint.
Our South West team also provides civil construction surveying, engineering surveying, aerial surveys and structural surveys in Warrnambool.
More Surveying Services in Warrnambool
See our Warrnambool surveying page and our South West Victoria overview. Our other Warrnambool services:
Survey for Every Stage of Your Warrnambool Energy Project

Site Investigation and Design Data
Plan layout and cut and fill from accurate ground data. Every project starts with a feature and level survey and a control network the whole build can rely on, with drone and aerial LiDAR covering large holdings quickly.
From that data we calculate design volumes so cut and fill can be planned before construction.

Wind Farm Construction
Have turbine foundations, crane pads, roads and cable trenches built where the design puts them. On the Hawkesdale Wind Farm we set out 23 turbine foundations, crane pads, 19 km of access roads and cable trenches across more than 2,280 hectares for BMD Constructions between 2020 and 2024.
Ongoing project survey management kept control and data consistent throughout.

Battery Storage Sites
Fit dense infrastructure onto a tight footprint without clashes. On the Terang BESS we prepared machine control models for earthworks and roads, then set out slabs, structures, services and electrical assets in close proximity.
Progressive verification caught issues while they were still easy to fix.

As-Constructed and Handover
Hand over reliable records of where every foundation, cable and road sits. We provide progressive and final as-constructed surveys in CAD and GIS-ready formats for compliance and long-term asset management.
See our full renewable energy surveying service.








