Contact Us

Renewable Energy Surveying in Warrnambool

Get turbines, roads, cabling and battery infrastructure built where the design says, with survey support from the first site visit to final handover.

Get A Free Quote
Renewable Energy Surveying in Warrnambool

Survey That Keeps Energy Projects on Position and Program

Energy sites bring huge footprints, tight tolerances on turbine and electrical positions and works that run for years. A control error early on leads to costly repositioning and compliance issues later.

Outright Surveying has delivered survey since 2009, including four years on the 96.6MW Hawkesdale Wind Farm and civil, structural and electrical setout on the Terang BESS. With more than 30 surveyors and four disciplines in one firm, developers, EPC contractors and project managers get one team from the first layout to as-built handover.

"Outright Surveying has been my trusty surveying partner for close to a decade. The service I have received from their surveyors and management team has been second to none." Neville Sabu Alex Construction Manager - John Holland

Why Outright

Why Warrnambool Energy Projects Choose Outright

Our renewable energy work in the South West is not theoretical. We have carried wind and battery projects in this region from early survey through to final records.

  • Hawkesdale Wind Farm

    23 turbines, 19 km of roads and a four-year program for BMD.

  • Terang BESS

    Civil, structural and electrical setout on a congested battery site.

  • One control network

    High-accuracy GNSS control set up at the start and held to the end.

  • Ground and air

    Field survey and drone capture combined to cover large sites.

  • Direct line to Troy

    Troy leads our South West team and works on the projects himself.

  • Depth when needed

    30+ surveyors and 15+ years in business to keep pace with your program.

Get A Free Quote
Testimonials

Trusted By Businesses Across Australia

  • Luke Vearing Construction Manager at Speedpro Civil

    Speedpro has had the pleasure of working alongside Outright Surveying for over 10 years, and we are always thoroughly impressed with their level of expertise, professionalism, accuracy, and reliability.

  • Rowan Bird Project Survey Manager at Seymour Whyte

    I’ve been working with Outright Surveying on several projects. The team consistently deliver with reliable and easy to deal with Surveyors, making the projects run smoothly.

  • Nevil Sabu Alex Construction Manager at John Holland

    Outright Surveying has been my trusty surveying partner for close to a decade. The service I have received from their surveyors and management team has been second to none.

Contact Us

Get A Free Quote in Warrnambool

Get turbines, roads, cabling and battery infrastructure built where the design says, with a team proven on Hawkesdale and Terang. Tell us about the project and we will give you a clear quote.

Send us a Message

FAQs

Renewable Energy Surveying in Warrnambool: Common Questions

  • Energy projects vary widely in size, so we scope each one. Early work such as a feature survey or design volumes is usually a fixed fee, while construction setout and survey management are priced on the program, often as a retained arrangement across the build. Send us the site layout and program and we will put a proposal together.

  • We supported BMD Constructions on the 96.6MW Hawkesdale Wind Farm from 2020 to 2024, and worked with TEC-C and Symal on the Terang BESS, providing civil, structural and electrical setout.

  • As early as possible. A feature survey and control network at the start give designers accurate ground data and give every later stage a single reference. Changing control partway through a project is where errors creep in.

  • Yes. On the Terang BESS, detailed electrical setout was a significant part of our scope, alongside slabs, structures, earthworks and roads, all within a tight site footprint.

  • Our South West team also provides civil construction surveying, engineering surveying, aerial surveys and structural surveys in Warrnambool.

Our Services in Warrnambool

Survey for Every Stage of Your Warrnambool Energy Project

  • Land surveying on site

    Site Investigation and Design Data

    Plan layout and cut and fill from accurate ground data. Every project starts with a feature and level survey and a control network the whole build can rely on, with drone and aerial LiDAR covering large holdings quickly.

    From that data we calculate design volumes so cut and fill can be planned before construction.

  • Building setout survey

    Wind Farm Construction

    Have turbine foundations, crane pads, roads and cable trenches built where the design puts them. On the Hawkesdale Wind Farm we set out 23 turbine foundations, crane pads, 19 km of access roads and cable trenches across more than 2,280 hectares for BMD Constructions between 2020 and 2024.

    Ongoing project survey management kept control and data consistent throughout.

  • Civil construction survey

    Battery Storage Sites

    Fit dense infrastructure onto a tight footprint without clashes. On the Terang BESS we prepared machine control models for earthworks and roads, then set out slabs, structures, services and electrical assets in close proximity.

    Progressive verification caught issues while they were still easy to fix.

  • Drone and laser scanning survey

    As-Constructed and Handover

    Hand over reliable records of where every foundation, cable and road sits. We provide progressive and final as-constructed surveys in CAD and GIS-ready formats for compliance and long-term asset management.

    See our full renewable energy surveying service.